Process · Published 2026-07-14 · 5 min read

Every homeowner asks some version of the same question before hacking starts: do I actually need permission for this. The honest answer depends on one fact that changes everything downstream, whether your home is strata or landed, and this page exists because that distinction rarely gets explained properly before someone finds out the hard way.
If you are looking for whether we handle this for you, we do, and our renovation service covers the submission and coordination work described here as part of the job. This page goes further than that: which authority you are actually dealing with, what a management approval requires under the law, and what happens if you skip it.
| Property type | Whose approval you need | When it applies |
|---|---|---|
| Strata (condo, apartment, serviced residence) | JMB or MC, in writing | Every job, cosmetic or structural |
| Landed (terrace, semi-D, bungalow) | The local council | Structural, footprint or facade changes only |
Landed property: cosmetic work is free, structural work is not
For a terrace, semi-D or bungalow, repainting, changing flooring, swapping kitchen cabinetry or replacing fixtures generally needs no council permit at all. The moment work touches structure, changes the building's footprint, alters the facade, or affects a load-bearing wall, that changes. Under Section 70 of the Street, Drainage and Building Act 1974, no person may erect or alter a building without the prior written permission of the local authority, and plans have to be prepared and submitted by a qualified person, typically an architect or engineer acting as Principal Submitting Person.
Once plans are submitted, the local authority has three calendar months to approve, disapprove, or raise a written requisition. If it does neither within that window, the applicant can apply to the State Authority directly, which is a useful backstop if a council submission goes quiet.
The councils that actually cover the Klang Valley
There is no single "Klang Valley council." Coverage splits by district, and a plan approved in one has no standing in another:
- DBKL (Dewan Bandaraya Kuala Lumpur) covers the Federal Territory of Kuala Lumpur.
- MBSA (Majlis Bandaraya Shah Alam) covers Shah Alam.
- MBPJ (Majlis Bandaraya Petaling Jaya) covers Petaling Jaya.
- MPSJ (Majlis Perbandaran Subang Jaya) covers Subang Jaya and the southern part of the Petaling district.
- MPK (Majlis Perbandaran Klang) covers Klang.
- MPKj (Majlis Perbandaran Kajang) covers Kajang.
- MPS (Majlis Perbandaran Sepang) covers the Sepang district.
MBPJ, for example, processes minor, standardised renovation permits through its eBuilding system in as little as 24 hours, while a structural submission routed through the national OSC 3.0 Plus Online system takes considerably longer and follows the same three-month statutory ceiling that applies everywhere else.
Strata property: the answer is always the JMB or the MC
For a condo, apartment or serviced residence, the local council is usually not the first authority you deal with, the building's own management is. Under the Strata Management Act 2013, the Joint Management Body (before a Management Corporation is formed) or the Management Corporation afterwards has the power to set and enforce by-laws governing renovation within the scheme, and most schemes require written approval before any work starts, regardless of whether that work is structural.
In practice, that approval process typically requires:
- A written application describing the scope of work, sometimes with a simple sketch or photos of what is planned.
- A refundable deposit, commonly in the range of RM2,000 to RM5,000, held against damage to lifts, corridors and other common property during the works.
- Compliance with the building's own restrictions, which usually include permitted working hours (commonly 9am to 5pm on weekdays only, with no noisy work on weekends), mandatory use of a padded service lift rather than the main passenger lift, and a minimum clearance, often around 300mm, when drilling near shared electrical conduits or water pipes.
- Waterproofing certification for any bathroom or wet area work, since a failed membrane in one unit can damage the ceiling of the unit below.
Deposits and house rules are set building by building. The figures here are the ranges reported across Malaysian buildings in 2026, not a rule your management office is bound by. Ask for your building's renovation by-laws in writing before you plan anything.
Wet works that touch shared plumbing or structural elements may additionally need a submission to the local council through a registered architect or engineer, on top of the management approval, which is why a serious condo renovation project treats management sign-off as the first step, not a formality alongside the real work.
Unauthorised structural changes in a strata scheme can be ordered reversed by the management body, on top of whatever deposit was already forfeited to cover the breach.
What happens if you skip it
For landed property, this is not a grey area. Section 70(13) of the Street, Drainage and Building Act 1974 makes unauthorised building work an offence carrying a fine of up to RM50,000, imprisonment of up to three years, or both, with a further fine of RM1,000 for each day the offence continues after conviction. Local authorities can and do order non-compliant work demolished, and even where a council allows a retroactive regularisation process, the owner pays the penalty first and may still have to remove anything that breaches setback or safety rules.
For strata property, the consequences are contractual rather than criminal, but they are not lighter for it. Unapproved work risks being ordered reversed at the owner's cost, the deposit gets forfeited against remediation, and repeated breaches can affect your standing with the management body long after the renovation is finished, since you are still living in that building.
Neither outcome saves time. Both cost more than the approval would have.
Sources
The permission requirement, the three-month decision window, and the penalty provisions for landed property are set out in Section 70 of the Street, Drainage and Building Act 1974. Council-level detail on which works require submission and typical processing routes is drawn from NextSix's guide to renovation permits and council approvals. JMB and MC approval requirements, deposit ranges, working hours and drilling clearances are drawn from Houz's guide to condo renovation regulations and general Strata Management Act 2013 background from Malaysia4u's strata management guide. Demolition and cost-recovery consequences for illegal renovation are described by Seri Pajam.